top of page

Tower House 10th Floor (Bristol)
Office space refurbishment allowing for an increase in the lettable rate per sq ft
​
Design elements included -
​
-
New noise reducing timber effect flooring
-
Concrete effect wall cladding
-
Suspended LED lighting
-
New teapoint
-
Silver backed blinds to reduce glare and solar gain




1/14
bottom of page